Plumbing Relocated

IMG_1536

IMG_1527

Old galvanized plumbing drainpipe was removed and redirected using new ABS pipe to where the new cabinets would eventually be installed and therefore hidden. Note: Anything in a wall that’s being torn down will have to be redirected; ie., plumbing, electrical, ventilation etc. Proper planning is a must!

Feb 3, 2015 iphone pics 009 (Copy)

New copper piping for future double kitchen sink was also installed.

Leave a Reply